BNSF FALL RIVER DIVISION
  • Welcome
  • At A Glance
    • Diagram
  • Gallery
    • Videos
  • Construction
    • Crew
  • Operations
    • Documentation
  • Links/References
  • Contact
Between 18 and 20 operators are required to run the railroad.  The entire layout operates under CTC control, operated by a dispatcher in the dispatch center.  Various positions are designed to accommodate all skills, proficiently levels and interests.  For a detailed description of each position, refer to the Documentation page.

Last Update:  March, 2023
  • Welcome
  • At A Glance
    • Diagram
  • Gallery
    • Videos
  • Construction
    • Crew
  • Operations
    • Documentation
  • Links/References
  • Contact